Emtec Consulting Engineers served as the MEP/FP engineer for the construction of a new two-story Oncology Center at Southampton Hospital, totaling approximately 12,839 square feet. The 5,789-square-foot first floor was designed to include exam rooms, a linear accelerator (linac) vault, physician offices, a lobby and waiting areas, a simulator, and a treatment planning room. The 7,041-square-foot second floor accommodated two conference rooms, an oncology treatment area, two nurse stations, four exam rooms, a reception and waiting space, lavatories, and a pharmacy, creating a comprehensive and patient-centered care environment. Southampton Hospital is a full-service healthcare facility located in Southampton, New York.
